1. Installation:
Warning: before using the mobile air conditioning, keep it upright for at least two hours.
The air conditioning can be easily moved in the room. In the moving process, ensure that the air
conditioning is in the upright position and the air conditioning should be placed on a flat surface.
Do not install and use the air conditioning in the bathroom or other humid environments.
1.1 Install the heat pipe assembly (as shown in Figure 1): screw the heat pipe assembly (exhaust
fitting end) into the exhaust port on the rear panel (counterclockwise).
Figure 1
1.2 Install the window sealing plate assembly
1). Half open the window, and mount the window sealing plate assembly to the window (as
shown in Figure 2 and Figure 3); the assembly can be placed in horizontal and vertical
direction.
2)Pull various components of the window sealing plate assembly open, adjust their opening
distance to bring both ends of the assembly into contact with the window frame, and fix
various components of the assembly.
1.3 Install the body
1 ) Move the machine with installed heat pipe and fittings before the window, and the
distance between the body and walls or other objects shall be least 50 cm (as shown in
Figure 4).
Figure 4
III. Installation and Adjustment
Figure2
Page: 7/15
Figure2
Figure3