DUCASSE INDUSTRIAL TWIN OP Instructivo De Montaje página 17

Ocultar thumbs Ver también para TWIN OP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Track, carriers and stoppers installation.
- Cut the tracks according
to the following formula
and then, drill.
- Set up the carrier sets, inserting the carrier bolts through the carriers, paying special
attention to their position.
-Insert DN80 stoppers, carriers and pulley stoppers
into the positions indicated in the diagram.
R
C
- Fix the tracks to the ceiling. Take into
consideration the distance which is shown
in the drawing. (Fixtures not included).
PF
23min
50
300
LR = 4AP - 2T
D
300
300
50
LR
300
D
- After fixing, clean the track grooves to
avoid possible leftover residues.
step 1
50
C
17

Publicidad

Tabla de contenido
loading

Tabla de contenido