step 2
- Plumb track to determine
the high GPR guide position.
- Drill the floor with a 6mm diameter drill bit to secure the guide in position right at
the end of the fixed sheet (PF), as shown in the diagram.
18
Set-up of the guides to the floor
PF
PF
PF
PF
PF