Kohler STERLING 6201 Serie Guía De Instrucciones página 10

Ocultar thumbs Ver también para STERLING 6201 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Drill Pilot Holes
6. Cut the Valve Holes
IMPORTANT! Risk of product damage. Determine whether your saw blade cuts on the pull or push
stroke. Failure to follow directions regarding your blade's cutting direction may damage the end wall's
finish.
If you are using a saw blade that cuts on the pull stroke, remove the end wall. Mark locations for
the valve and shower controls on the unfinished side (back side) of the end wall.
If you are using a saw blade that cuts on the push stroke, mark locations for the valve and shower
controls on the finished side (front side) of the end wall. When completed, remove the end wall.
Drill 1/4" (6 mm) pilot holes at the marked locations.
Carefully drill the fitting holes with a saw of the correct diameter.
1020187-2-F
Cut the Holes
10
Sterling

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 6202 serie

Tabla de contenido