DUCASSE INDUSTRIAL SEGMENTA 4 Serie Instructivo De Montaje página 26

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

step 3
OPTION 1: Drilled clamp set-up, with mechanized glass
* Recommended option for glass over 50 kg.
* Not required for the operation of the system.
* Tempered glass usage recommended.
* Consider door handle drilling.
* The installation of the plastic hubs and the assembly of the clamps apply for each
one of the pressure clamps of the system.
- Place the clamp on the crystal
6mm from the edge and place the
hub on the crystal, according with
the width.
R
e
26
Clamp set-up
e = 8-10mm
e = 12-13mm
5
13 ± 1
ø15
88 ± 1
- Place the other part of the clamp and
the bolts. Then, tighten with 4mm Allen
key.
6
Max 15 n/m

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Segmenta 4 tauro plvd 80

Tabla de contenido