Descargar Imprimir esta página

Tripp-Lite SmartOnline SU6000RT3UPM Manual De Operación página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Connection
Installation—With Isolation Transformer
Hardwire your isolation transformer's UPS connector to
1
your UPS's input and output.
Remove the tops of the boxes covering the UPS's and transformer's input and output
terminals. Pass the free end of the isolation transformer's UPS connector through
the UPS's cover box's knockout, then connect it to the UPS's input and output
terminals according to the labels on the wires and the terminals. Replace the top of
the box covering the UPS's input and output terminals.
Hardwire your equipment to your isolation transformer's
2
equipment output.
Pass your equipment's power cable(s) through one of the transformer cover box's
left knockouts, then connect them to the transformer's equipment output terminals.
See the Output Voltage Diagram to determine which terminal connections will provide
which voltages.
Select your input voltage. Hardwire your isolation
3
transformer's utility input to your utility power source.
Place a jumper between the 208V or 240V voltage select terminals to set the transformer's
input voltage. Connect one end of a power cable to your utility power source. Pass
the cable's other end through one of the transformer cover box's center knockouts,
then connect the cable to the utility input terminals. Replace the top of the transformer
cover box.
Continue with Installation—All Applications (pg. 10)
continued
1
2
3
9
AC OUTPUT VOLTAGE DIAGRAM
208
V
240
V
120
120
V
V

Publicidad

Capítulos

loading