Daikin RXJ20M5V1B Manual De Instalación
Ocultar thumbs Ver también para RXJ20M5V1B:
Tabla de contenido

Publicidad

Installation manual
R32 Split system air conditioners
RXJ20M5V1B
RXJ25M5V1B
RXJ35M5V1B
RXA20A5V1B
RXA25A5V1B
RXA35A5V1B
RXM20R5V1B
RXM25R5V1B
RXM35R5V1B
ARXM25R5V1B
ARXM35R5V1B
RXJ20M5V1B9
RXJ25M5V1B9
RXJ35M5V1B9
RXA20A5V1B9
RXA25A5V1B9
RXA35A5V1B9
RXM20R5V1B9
RXM25R5V1B9
RXM35R5V1B9
Installation manual
ARXM25R5V1B9
English
R32 Split system air conditioners
ARXM35R5V1B9

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Daikin RXJ20M5V1B

  • Página 1 Installation manual R32 Split system air conditioners RXJ20M5V1B RXJ25M5V1B RXJ35M5V1B RXA20A5V1B RXA25A5V1B RXA35A5V1B RXM20R5V1B RXM25R5V1B RXM35R5V1B ARXM25R5V1B ARXM35R5V1B RXJ20M5V1B9 RXJ25M5V1B9 RXJ35M5V1B9 RXA20A5V1B9 RXA25A5V1B9 RXA35A5V1B9 RXM20R5V1B9 RXM25R5V1B9 RXM35R5V1B9 Installation manual ARXM25R5V1B9 English R32 Split system air conditioners ARXM35R5V1B9...
  • Página 2 3P516375-12H...
  • Página 3 3P516375-14M...
  • Página 4 3P516375-17R...
  • Página 5: Tabla De Contenido

    To set the facility mode ..........12 Daikin website (publicly accessible). Standby electricity saving function ..........13 ▪ The full set of latest technical data is available on the Daikin 9.2.1 About the standby electricity saving function ....13 Business Portal (authentication required).
  • Página 6 2 Specific installer safety instructions Installation site (see "4.1 Preparing the installation site" [ 4  7]) Charging refrigerant (see "6 Charging refrigerant" [ 4  10]) CAUTION WARNING ▪ Check if the installation location can support the unit's The refrigerant inside the unit is mildly flammable, but weight.
  • Página 7: About The Box

    3 About the box WARNING About the box ALWAYS use multicore cable for power supply cables. Outdoor unit WARNING Use an all-pole disconnection type breaker with at least 3  mm between the contact point gaps that provide full 3.1.1 To remove the accessories from the disconnection under overvoltage category III.
  • Página 8: Additional Installation Site Requirements Of The Outdoor Unit In Cold Climates

    4 Unit installation It is recommended to install a baffle plate when the air outlet is Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field exposed to wind. supply). It is recommended to install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind.
  • Página 9: Piping Installation

    5 Piping installation What? Distance Minimum allowable pipe length 1.5 m Maximum allowable height difference 15 m Connecting the refrigerant piping Drain port Bottom frame DANGER: RISK OF BURNING/SCALDING Drain plug Hose (field supply) CAUTION ▪ No brazing or welding on site for units with R32 Piping installation refrigerant charge during shipment.
  • Página 10: Checking The Refrigerant Piping

    6 Charging refrigerant Refrigerant type: R32 Checking the refrigerant piping Global warming potential (GWP) value: 675 5.3.1 To check for leaks WARNING: MILDLY FLAMMABLE MATERIAL The refrigerant inside this unit is mildly flammable. NOTICE Do NOT exceed the unit's maximum working pressure (see WARNING "PS High"...
  • Página 11: To Charge Additional Refrigerant

    7 Electrical installation To charge additional refrigerant WARNING ALWAYS use multicore cable for power supply cables. WARNING WARNING ▪ Only use R32 as refrigerant. Other substances may cause explosions and accidents. Use an all-pole disconnection type breaker with at least 3 ...
  • Página 12: Specifications Of Standard Wiring Components

    8 Finishing the outdoor unit installation Specifications of standard wiring Finishing the outdoor unit components installation Component Class 20 Class 25+35 To finish the outdoor unit Power supply cable Voltage 220~240 V installation Phase DANGER: RISK OF ELECTROCUTION Frequency 50 Hz Wire sizes 3-core cable ▪...
  • Página 13: Standby Electricity Saving Function

    Daikin ▪ Cutting jumper J6 sets the indoor unit fan to the highest Business Portal (authentication required).
  • Página 14: To Perform A Test Run

    Daikin website (publicly accessible). Prerequisite: Test run may be performed in cooling or heating mode. ▪ The full set of latest technical data is available on the Daikin Prerequisite: Test run should be performed in accordance with the Business Portal (authentication required).
  • Página 15 13 Technical data Symbol Meaning Symbol Meaning H*P, LED*, V*L Pilot lamp, light emitting diode Terminal Light emitting diode (service Terminal strip (block) monitor green) Electronic expansion valve coil HIGH VOLTAGE High voltage Y*R, Y*S Reversing solenoid valve coil Intelligent eye sensor Ferrite core IPM* Intelligent power module...
  • Página 16 DAIKIN ISITMA VE SOĞUTMA SİSTEMLERİ SAN.TİC. A.Ş. Gülsuyu Mahallesi, Fevzi Çakmak Caddesi, Burçak Sokak, No:20, 34848 Maltepe İSTANBUL / TÜRKİYE Tel: 0216 453 27 00 Faks: 0216 671 06 00 Çağrı Merkezi: 444 999 0 Web: www.daikin.com.tr 3P650253-1 2021.02 Verantwortung für Energie und Umwelt...

Tabla de contenido