GE RAVDP18 Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Drain Pan Installation
IMPORTANT: Drain pan installation is for 18,000 BTU/hr, chassis height 47 inches units only.
STEP 4
Install Drain Pan
Drain Pan
Using the mounting holes on the drain pan attach
the drain pan to the floor with the appropriate field
supplied hardware.
IMPORTANT: To prevent water leaks use only the
factory supplied mounting holes. NEVER make
penetrations in the drain pan itself.
Mounting Holes
4

Publicidad

Tabla de contenido
loading

Tabla de contenido