Temporary Lighting; Activate Loads In Bypass - Lutron Electronics Softswitch128 XPS Serie Manual Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 21

Temporary Lighting

You do not need to install a temporary distribution
panel. Connect load wires into the appropriate
terminal blocks. Each input breaker can supply
power to a load while the bypass jumper protects
the module from load faults.
Warning! Verify that the panel is fed from
the correct voltage. A feed miswire or loss
of a feed neutral can cause over-voltage
damage to the equipment. Do NOT
remove bypass jumpers at this point--they
protect the modules from load faults.

Activate Loads in Bypass

A. Complete load wiring.
B. Check that the bypass jumpers are in place.
These jumpers protect from load faults and must
be used to check load wiring when it is installed or
modified.
Warning! Verify that the panel is fed
from the correct voltage. A feed miswire
or loss of a feed neutral can cause
damage to the equipment.
C. Turn a load's input circuit breaker ON.
The load should energize, the breaker should not
trip, and total load current must be within the
circuit breaker's limit and less than or equivalent to
16 A.
D. Repeat step C for each circuit with completed
load wiring.
16 Installation Guide for Switching Panels
Input circuit breaker
Hot/Live
Switched hot/live
AC RMS
current meter
H
SH
Bypass jumper protects the
switch module from load
faults.
Load circuit wiring
H
SH
H
SH
H
SH
H
SH
R

Publicidad

Tabla de contenido
loading

Tabla de contenido