Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
English

6. Connections

WARNING:
Hydraulic connections are the first ones to be assembeled during installing operation, to
be followed by electric connections. Remove the caps inside the hydraulic fittings connection before to connect the
chiller to your device.
WARNING:
The chillers has been cleaned by means of specific cleaning products. The eventual
findings of solid particles in the hydraulic system might cause the loss of warranty.
Hydraulic connections. For the hydraulic connection please refer to the enclosed hydraulic plan. The flow rate
and the fluid circulation direction must be respected during connection in accordance with INLET-OUTLET
identification plates.
CAUTION:
Fill the tank before connecting Hydraulic tubes (as described in the start-up procedure).
Remove the caps inside the hydraulic fittings connection before to connect the chiller to your device and open the
ball valves.
Hydraulic connection plate
Picture 4 –Hydraulic connection plate
Hydraulic draining connection
For draining procedure please refer to Appendix B1.
Picture 5 – Hydraulic draining connection
70040-122_01-_-(PC2500_Op._Manual_IT-EN-DE-FR-ES-RU).docx
8

Publicidad

Tabla de contenido
loading

Tabla de contenido