CHAFFOTEAUX 3318992 Instrucciones De Instalacion Y Uso página 60

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 68
4.2 Installation of gateway on the boiler
WARNING!
Before applying the double-sided tape,
you should clean the surface thoroughly
with solvent and dry it thoroughly.
1. Stick the double-sided tape to the back
of the support plate (Figure 7); remove
the protective film and attach to the
boiler;
2. Attach to the plate, pressing along the
sides (Figure 8);
3. Attach the cover, pushing gently (Figure
9).
NOTE:
In order to avoid interference problems,
use a shielded cable or twisted pair cable.
The following versions of the Chaffoteaux
Expert
Control
compatible with Chaffolink:
- 01.00.00
- 01.00.04
If this is the case, replace the existing
Expert Control with the one supplied in
the Chaffolink kit.
60 /GB
software
are
7
8
not
9

Publicidad

Tabla de contenido
loading

Tabla de contenido