Getting Started; Status Indication - alfen Eve Double Pro-line Manual Del Usuario

Ocultar thumbs Ver también para Eve Double Pro-line:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 11
Installing
1
Remove the front cover.
Place the Eve Double Pro-line with the front cover
facing upwards.
Use the box as a base, to avoid damaging the Eve
Double Pro-line.
Remove the two M8x20 screws from the
underside.
Unscrew the two M8x20 screws on the side
completely.
Pull the front cover from the underside upwards
first and then straight up.
For wall mounting only:
2
Drill the holes for the mounting bracket.
Mark the holes to be drilled, drill them and the fit
the wall plugs.
Use the mounting bracket or the drilling
template supplied to mark the holes.
Ensure the wall plugs and screws are suitable
for the type of wall.
3
Fit the mounting bracket.
Secure the mounting bracket to the wall or to
the mounting pole using the 2 screws.
4
Drill the holes for the Eve Double Pro-line.
Position the Eve Double Pro-line on the mounting
bracket.
Do not drop the Eve Double Pro-line. Keep hold
of the Eve Double Pro-line with one hand.
Mark the holes to be drilled, drill them and the fit
the wall plugs.
Ensure the wall plugs and screws are suitable
for the type of wall.
5
Fit the Eve Double Pro-line.
Position the Eve Double Pro-line on the mounting
bracket.
Do not drop the Eve Double Pro-line. Keep hold
of the Eve Double Pro-line with one hand.
Fit and tighten the two M8 x 50 mm hexagon head
wood screws.
For control management via SIM only:
6
Fit the SIM card.
The SIM card holder is located to the left of the
display. Insert the SIM card with the chip to the
back of the housing.
7
Remove the subframe and the plug connection.
Press clamp fastening on one side first and lift
the subframe on that side.
Then press the clamp fastening on the other side
and remove the subframe.

Getting started

Eve Double Pro-line
8
Connect the power cable(s).
Make sure the power cable is not live.
Feed the cable(s) through the gland.
Connect the cores to the operating switch and
earth to the relevant terminal.
Tighten the gland(s).
Ensure the cable is clamped firmly in the gland.
Only then will the IP54 sealing be effective.
9
Refit the subframe.
Press the clamp fastening into place on one side
first and then the clamp fastening on the other side.
Do not damage the power cables.
For control management via wired internet only:
10 Connect the ethernet cable.
11 Refit the front cover.
Fit the front cover onto the housing from the top.
Retighten the two M8x20 screws on the side
completely.
Retighten the two M8x20 screws from the
underside.
Avoid dropping the front cover. Keep hold of
the front cover with one hand.

Status indication

Charging pass accepted, cable connected.
Communicating with vehicle or charged
and ready to use.
Charging transaction active, with indication
of charging rate.
Error message, with error code.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido