Xylem SI Analytics Lab 955 Guia De Inicio Rapido página 4

Ocultar thumbs Ver también para SI Analytics Lab 955:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
English
Status display
indicators
Socket field
connections
Initial
commissioning
4
AR
Stability control (AutoRead) is active
ARng
Automatic range switchover; meter measures with
highest possible resolution
Cal
Calibration
LoBat
With battery operation: Batteries almost empty
nLF
Nonlinear temperature compensation
TP
Temperature measurement active
Tref20
Reference temperature of 20 °C
TRef25
Reference temperature of 25 °C
TIME
Setting of calibration interval
1
1
Conductivity measuring cell
2
Service interface
3
Connection for line adaptor
Insert the supplied batteries.
1
When doing so make sure that the poles of the batteries are
positioned correctly.
2
Connect the power pack if necessary.
Switch on the meter with the <On/Off> key.
3
Caution
Follow the safety instructions of the used sensors.
The operating manuals of the sensors are available on the supplied CD and on
the Internet under www.WTW.com.
3
2
ba75928y01
Lab 955
10/2015

Publicidad

Tabla de contenido
loading

Tabla de contenido