Leggett & Platt PRO-MOTION perfomance Queen Manual Del Usario página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 6
Plug electrical power cord into a working, grounded electrical outlet.
Note: An electrical surge protection device is recommended (not included).
STEP 7
Briefly activate all functions of the base with the remote control to verify
all features are in working order. If base does not operate, refer to the
Troubleshooting section of this manual.
STEP 8
Return base to the level position.
STEP 9
Install mattress retainer at the foot end of the adjustable base as follows:
a. Locate grommeted holes at foot end of base.
b. Place mattress retainer ends into grommeted holes in top surface
of adjustable base (FIGURE 2). Press down until horizontal retainer
section is flush against base.
FIGURE 2
NOTE: If base is to be set up without a headboard, install
mattress to complete basic installation. If headboard
is to be installed, proceed to Headboard Bracket
Installation. (Headboard Bracket sold as accessory.)
INSTALLATION
MATTRESS
RETAINER
Performance Models Pro-motion Owners Manual 99301466-b
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pro-motion perfomance split cal-king

Tabla de contenido