GE Druck ADTS 542F Guía De Seguridad E Instalación página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 63
3. ADTS5xxF
6
Figure 3-1: ADTS542F Front Panel (See Figure 4-1 for other variants)
3.1 Power-Up Test (see Figure 3.1)
1.
Fit "Pitot" (Pt) (1) and "Static" (Ps) (2) port blanks.
2.
Ensure that the test set is connected to an external power supply and the supply is
switched on.
3.
Use the On/Standby Switch (3) on the front of the test set to switch the test set on.
The test set performs a self test, resulting in a test set status indication (4a) "Pass" or
"Fault".
© 2014 General Electric Company – All rights reserved.
1
3
Power-Up Test (see Figure 3.1)
2
5
8
ADTS Safety and Installation Guide-English | 11
4
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Druck adts 552fDruck adts 553fDruck adts 554f

Tabla de contenido