LF Millennium 69P1 Instrucciones Y Mantenimiento página 44

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Use and maintenance manual | Series MILLENNIUM
2) PROGRAMMING THE REGENERATION TIME
Press and hold the buttons
and the item is unlocked.
Press the button
and the symbol for the wrench will light up on the display
Press the button
Press again the button
flashing 02 - 00.
With the buttons
Press again the button
flashing.
With the buttons
Confirm with the button
the key pad is locked.
3) SOFTENING WATER QUANTITY PROGRAMMING
Depending on the hardness of the incoming water
Press and hold the buttons at the same time
unlocked key appears.
Press the button
and the symbol for the wrench will light up on the display
44
at the same time for 5 seconds until you hear the sound of a beep
.
the first 2 digits of the display representing the regeneration time will start
set the desired regeneration time.
the second 2 digits of the display representing the minutes 02 - 00 will start
set the desired regeneration minutes.
and wait 60 seconds until you hear the sound of the beep and it indicates
for 5 seconds until you hear the sound and the
.
.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Millennium 69p3

Tabla de contenido