Setting The Maintenance Date; Start-Up With Service Software; Re-Adjusting The Amm - Bosch NRS 1 687 001 866 Instrucciones Para La Instalación

Amm con cámara de medición de andros
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

en
18 | 1 687 001 866 / 1 682 666 309 | Start-up
3.3.2

Setting the maintenance date

1. Select "Main menu >> Configuration" (uo) and con-
firm with V or E.
2. Select "Petrol config. >> Service date" (uo) and
confirm with V or E.
? The maintenance status is interrogated.
|
1 689 978 505
2010-09-23
3. Set the status to "Yes" (YES).
? The new maintenance date is set.
4. Confirm with V or E.
? Automatic return to the "Settings >> Gasoline"
menu.
"
This completes the entry procedure.
3.4

Start-up with service software

i
The BEA must be at the corresponding operating
temperature for start-up; this is attained
approx. 5 min. after switch-on.
3.4.1

Re-adjusting the AMM

Entry of set values
1. Switch on the BEA.
2. Connect the service PC to the BEA by way of the
serial interface.
3. Start the service software "Bea_kd.exe".
4. Select "Exhaust gas >> AMM >> Test program".
? The "Function selection" dialog window is
opened.
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Amm 1 682 666 309

Tabla de contenido