Descargar Imprimir esta página

Bond HYPH4601-12 Guía De Instrucciones Rápida página 10

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
10. Use the anchoring nut (EE) to fasten the
product into the ground.
11. Open the door from the tank housing (D) and
place the propane gas tank (not included) into the
preassembled tank supporter. Tighten the belt to
ensure the propane gas tank is fully secure.
Note: Once the tank is connected to the regulator
in the next step be sure to close the door prior to
use.
12. Turn the cylinder valve on the tank
clockwise to close the propane tank.
Attach the preassembled regulator to the
cylinder valve by turning the regulator
coupling nut clockwise. Make sure it is
fastened securely and tighten connections
by hand only.
Bond Manufacturing Company | Page 10
D
CYLINDER VALVE
BLACK COUPLING NUT
turn clockwise to connect
REGULATOR
EE
PRESSURE
RELIEF VALVE
BLEED-OFF
VALVE
turn clockwise
to reseal

Publicidad

loading

Este manual también es adecuado para:

68149