9
9A
9B
9B
9C
9 HANDLE ADAPTER ATTACHMENT
Thread the Handle Adapters (9A) over the Valve Stems (9B) and tighten so that the Handle
Adapters (9A) sit on top of the Putty Plate (9C) or Putty Rings (9D).
10
10A
10B
10 HANDLE INSTALLATION
Connect Handles (10A) onto Handle Adapters (10B). Be sure Valves and Levers are in
the "OFF" position. Secure handles by holding the Lever (10C) in place and tighten the
Hubs (10D) by rotating them in a clockwise direction. To remove handles, rotate Hubs
(10D) in a counterclockwise direction.
11
11B
11A
HOT
11 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (11A) to Faucet Inlets (11B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines not included). Please
follow manufacturer's instructions when installing supply lines.
9A
9B
9D
10C
10D
11B
11A
COLD
ENGLISH
DRAIN BODY INSTALLATION
12
A
9 PUSH & SEAL™ INSTALL
A: Disassemble Push&Seal™ as shown.
B: Place Push&Seal™ Body (12A) into sink. From below sink tighten Seal (12B),
Washer (12C), and Nut (12D) onto the Push&Seal™ Body (12A).
13
A
B
13 CONNECT TO PUSH & SEAL™ TO DRAIN
A: Connect to Drain
B: Firmly hand tighten nut (13A). Push to Activate.
14
14 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
4
B
13A
12A
12B
12C
12D