INSTALLATION INSTRUCTIONS
Pathfinder Tunnel Fixture
SAFETY PRECAUTIONS:
• SUITABLE FOR INSTALLATION IN WET AND/OR DUSTY LOCATIONS (IP66 RATED)
• FOLLOW ALL STANDARDS SPECIFIED BY THE NEC FOR INSTALLATION. CONSULT A LOCAL LICENSED
ELECTRICIAN OR ELECTRICAL CONTRACTOR IF YOU ARE UNSURE.
• WHEN USING ELECTRICAL EQUIPMENT, BASIC SAFETY PRECAUTIONS SHOULD ALWAYS BE FOLLOWED.
ITEMS SUCH AS GLOVES AND PROTECTIVE EYEWEAR ARE RECOMMENDED.
• DO NOT LIFT THE FIXTURE BY ITS WIRES.
• ALWAYS ENSURE THE FIXTURE IS SECURE WHEN MOUNTED, TEMPORARILY OR PERMANENTLY, AT ANY
HEIGHT ABOVE GROUND.
• THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT,
NOR TO PROVIDE EVERY POSSIBLE CONTINGENCY TO MEET IN RELATION WITH INSTALLATION,
OPERATION, OR MAINTENANCE.
WIRING:
1. FOR 100-277VAC INPUT, CONNECT THE BLACK WIRE COMING FROM THE LED FIXTURE TO LIVE/HOT VOLTAGE
WIRE INSIDE THE JUNCTION BOX OR CONE (DEPENDING ON MOUNTING STYLE).
2. FOR 100-277VAC INPUT, CONNECT THE WHITE WIRE COMING FROM THE LED FIXTURE TO THE
NEUTRAL WIRE INSIDE THE JUNCTION BOX.
3. CONNECT THE GREEN OR GREEN/YELLOW GROUND WIRE TO THE APPROPRIATE GREEN EARTH
GROUND WIRE
EiKO Global | 23220 W 84th St, Shawnee, KS 66227 | (P) 1-800-852-2217
EiKO Canada | 81 King St, Barrie, Ontario L4N 6B5 | (P) 1-705-721-5189
INCOMING MAINS
JUNCTION BOX
PATHFINDER FIXTURE
eiko.com

Publicidad

loading

Resumen de contenidos para Eiko Xeleum

  • Página 1 3. CONNECT THE GREEN OR GREEN/YELLOW GROUND WIRE TO THE APPROPRIATE GREEN EARTH GROUND WIRE INCOMING MAINS JUNCTION BOX PATHFINDER FIXTURE EiKO Global | 23220 W 84th St, Shawnee, KS 66227 | (P) 1-800-852-2217 eiko.com EiKO Canada | 81 King St, Barrie, Ontario L4N 6B5 | (P) 1-705-721-5189...
  • Página 2 INSTALLATION: ALWAYS TURN OFF THE POWER SUPPLY FROM MAIN CIRCUIT BREAKER FIRST! 1. THE STAINLESS STEEL MOUNTING BRACKET IS GENERALLY MOUNTED FIRST. THE MOUNTING HARDWARE AND METHOD OF ATTACHMENT IS PROVIDED BY OTHERS. • NOTE: THERE ARE FOUR HOLES ON THE BRACKET FOR MOUNTING. THESE HOLES ARE ELONGATED 1 7/32” LONG BY 1/2”...
  • Página 3: Artefacto De Túnel Pathfinder

    3. CONECTE EL CABLE DE TIERRA VERDE O VERDE / AMARILLO AL CABLE DE TIERRA VERDE APROPIADO. REDES DE ENTRADA CAJA DE CONEXIONES ARTEFACTO PATHFINDER EiKO Global | 23220 W 84th St, Shawnee, KS 66227 | (T) 1-800-852-2217 eiko.com EiKO Canada | 81 King St, Barrie, Ontario L4N 6B5 | (T) 1-705-721-5189...
  • Página 4: Instalación

    INSTALACIÓN: ¡SIEMPRE DESCONECTE PRIMERO LA FUENTE DE ENERGÍA DEL DISYUNTOR PRINCIPAL! 1. NORMALMENTE SE MONTA PRIMERO EL SOPORTE DE MONTAJE DE ACERO INOXIDABLE. LA TORNILLERÍA DE MONTAJE Y EL MÉTODO DE FIJACIÓN SON PROPORCIONADOS POR TERCEROS. • AVISO: HAY CUATRO ORIFICIOS EN EL SOPORTE PARA EL MONTAJE. ESTOS ORIFICIOS SON ALARGADOS DE 1 7/32 PULG DE LARGO POR 1/2 PULG DE ANCHO Y REQUIEREN UNA TORNILLERÍA ADECUADA.
  • Página 5: Luminaire De Tunnel Pathfinder

    3. RACCORDER LE CÂBLE DE MISE À LA TERRE VERT OU VERT/JAUNE AU CÂBLE DE MISE À LA TERRE VERT APPROPRIÉ. CÂBLES ENTRANTS BOÎTE DE JONCTION LUMINAIRE PATHFINDER EiKO Global | 23220 W 84th St, Shawnee, KS 66227 | (T) 1 800 852-2217 eiko.com EiKO Canada | 81 King St, Barrie, Ontario L4N 6B5 | (T) 1 705 721-5189...
  • Página 6 INSTALLATION: AVANT TOUT, TOUJOURS COUPER L’ALIMENTATION ÉLECTRIQUE DU DISJONCTEUR PRINCIPAL! 1. LE SUPPORT D’INSTALLATION EN ACIER INOXYDABLE EST GÉNÉRALEMENT INSTALLÉ EN PREMIER. LE MATÉRIEL ET LA MÉTHODE D’INSTALLATION SONT FOURNIS PAR D’AUTRES. • REMARQUE: IL Y A QUATRE TROUS D’INSTALLATION DANS LE SUPPORT. CES TROUS ONT UNE LONGUEUR DE 1 7/32 PO ET UNE LARGEUR DE 1/2 PO ET NÉCESSITENT LE MATÉRIEL APPROPRIÉ.