Step 5
1. Mount two pulleys that are in the lat pull-down mast using the screws (6), 4 washers and two nuts
as well as 4 pulley bearings. Pay attention to the arrangement of the sockets as shown!
2. Mount the third roller on the U-profile below the lat pull-down mast with a screw (3), two washers
and a nut.
3. Insert the guide rods into the lat pull-down mast and screw the components together with two
screws (1) and two washers.
4. Attach the entire lat pull-down mast to the upper connecting frame and use two screws (6), four
washers and two nuts.
6
1
1
3.
2.
3
3
6
3
2
33
6 (2x) (M10x65)
3 (1x) (M10x45)
6
5
4.
1.
6
6
6
6
Pulley bearings
6
1 (2x) (M10x20)
5 (2x) (M10x65)
EN