ShelterLogic 90101 Instrucciones De Montaje página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. INSTALLING DOOR PANEL:
A. Before installing end panel, align the door frame with
your shelter and level. Align grommets on door panel
with holes in frame. Match up to door opening.
B. Insert Black Plugs into each grommet through fabric
into frame. then tuck excess fabric around the frame
inside the shelter. See Figure F.
detail e
C. Loosen cover and roll it back.
D. Pull fabric tight and attach clip that fits pipe onto shelter frame to hold fabric in place. Drill hole through pole
and clip together. Screw clip to frame using screw (802486). Trim fabric if necessary. See Figure G.
FiGure G
end panel
802461
Page 7
FiGure F
802483 or 802458
802486
802462
05-90101_0C

Publicidad

Tabla de contenido
loading

Tabla de contenido