1.- INSTALLATION
Positioning and levelling
The positioning and electric and gas installation must always be carried out by an AUTHORISED
TECHNICIAN, observing the standards of each country .
it is advisable to install an extraction hood for the optimum operation of the appliance.
Place the appliance in a well-ventilated place.
Level and adjust the height of the appliance. (Fig. 1)
Gas connection
An Authorised Technician, observing the regulations in each country, must always carry out the
appliance's gas connection.
The general installation must have a stopcock and a pressure regulator and it is advisable to install a shut-
off cock on each individual appliance. (Fig.2)
A tube of at least Ø 12 x 10 mm should be used for the appliance's gas connection, and tightened with a
¾" nut to connect the Bain Marie.
Conversion to other types of gas
If the appliance is prepared for a different type of gas to the one available in the installation, you should
proceed as follows:
Cut off the gas to the appliance if connected. (Any conversion of the appliance's gas circuit must always be
carried out by a QUALIFIED TECHNICIAN).
Electrical connection
An AUTHORISED TECHNICIAN should always carry out the appliance's electrical connection.
The legal standards in force in each country on connections to the mains should be taken into account.
Check that the mains voltage corresponds to that indicated on the nameplate.
Use cable sleeves made out of polychloroprene or other similar materials (H05RN-F), for the connection.
Put an autonomous power switch with fuses into the mains socket, with a minimum distance between
contacts of at least 3 mm.
It is obligatory to earth the appliance. The manufacturer takes no responsibility if this requirement is not
fulfilled.
The section of cable sleeve and the rating of the fuses to be installed in the power switch are indicated in
table no 7
Route the cable through the stuffing box and connect it to the terminal strip (R).
VERY IMPORTANT: When several appliances are installed in series, they should be earthed to each other
using the point assigned for this purpose, located in the rear part of the appliance.
Water and drainage connection
The water intake and its location within the appliance are defined in the "General Dimension and
connection" with the letter "EV". The water pressure must be between 2 and 4 bar and the maximum
temperature is 60ºC. The water intake in the machines is ½" in G-700 and 3/4" in G-900. To fill up the pan
turn the hot or the cold water inlet tap in G-700 or turn the water inlet tap as shows Fig.7 to the required
position in G-900.
.