Prepare The Site - Kohler K-2352 Guia De Instalacion

Lavabo de sobre cubierta
Ocultar thumbs Ver también para K-2352:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cut-out Line

1. Prepare the Site

Cut along the cut-out line on the cut-out template.
Position the cut-out template square on the countertop. Use
centerlines to ensure clearance between the lavatory, backsplash,
and faucet.
Secure the template in place with masking tape.
Use a pencil to trace around the cut-out line on the countertop.
NOTE: Ensure the faucet spout will reach a minimum of 3" (7.6 cm)
over the rim of the lavatory and the stream of water is directed
toward the center of the lavatory basin.
Recheck the clearance between the lavatory, backsplash, and
faucet. Adjust the traced cut-out line, if necessary.
Use a pencil to mark the exact center of the four mounting hole
locations on the countertop.
Remove the cut-out template.
Cut along the inside of the marked pencil line with a jigsaw.
Slowly drill four 5/16" diameter mounting holes at the marked
centers.
Kohler Co.
Backsplash
5
Outside Edge
of Lavatory
1061995-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido