Pin Allocation; Commissioning Instructions - Festo CPX-FVDA-P Manual De Instrucciones

Descripción resumida
Ocultar thumbs Ver también para CPX-FVDA-P:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 43
CPX-FVDA-P

Pin allocation

CPX-FVDA-P with connection block CPX-M-AB-4-M12X2-5POL
Pin allocation X1, X2
3
2
1
5
4
FE = functional earth
n.c. = free (not connected)
1) Unswitched voltage U
supply)
2) All output voltages are likewise derived from the internal contact rail U
Fig. 6
The metal thread of the connection block CPX-M-AB-4-M12X2-5POL is connected
internally with pin 5 (functional earth FE).
5

Commissioning instructions

The operational capability of the safety device is to be checked at adequate inter-
vals. It is the responsibility of the operator to choose the type of check and time
intervals in the specified time period. The check is to be conducted so the flawless
functioning of the safety device in interaction with all the components can be veri-
fied.
Additional information regarding commissioning can be found in the description
P.BE.CPX-FVDA-P.
Festo CPX-FVDA-P-Z6 1303a English
Socket X1
4
1: 0V CH1
2: +24V CH1
5
3: F–DO(M) CH1
1
4: F–DO(P) CH1
x1
5: FE
Socket X2
1: 0V CH2
X2
2
2: +24V CH2
3: F–DO(M) CH2
4: F–DO(P) CH2
3
5: FE
usable for supply of intelligent load systems (auxiliary
VAL
Pin allocation X3, X4
3
1)
1)
2)
2
2)
x3
X4
1)
1
1)
5
2)
2)
4
4
Socket X3
5
1: n.c.
2: n.c.
1
3: n.c.
4: n.c.
5: FE
Socket X4
2
1: n.c.
2: n.c.
3: n.c.
3
4: n.c.
5: FE
VAL
37

Publicidad

Tabla de contenido
loading

Tabla de contenido