Pentair Pentek Solar Drive Wiring Instructions - Pentair PENTEK PSD30 Manual De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PENTAIR PENTEK
Once the system is wired (per Figure 8), the power conductors wired to the DIN rail terminals
inside the Pentair Pentek Solar Drive should be tightened with torque values of:
– Solar PV and motor load conductors: 11 lb-in
– AC source conductors: 8 lb-in
The cable glands (cord grips) on the bottom of the enclosure should be used as follows:
– 1/2 inch cord grips should only be used with a cord that is 0.280-0.455 inch outer diameter.
– 3/4 inch cord grips should only be used with a cord that is 0.455-0.705 inch outer diameter.
When all conductors are wired into the controller, the cover (enclosure door) should be replaced
and tightened using the cover screws to 2-3 in-lb or equivalent.
Terminal 1
(Yellow)
Terminal Aux
(Gray)
Yellow
Red
Black
Float Switch/
Other Sensors
Single phase motor loads should be wired as shown in Figure 8. Single phase 3-wire motors
should be wired so that the Common Lead is wired to Phase A, Starting Winding to AUX and Main
Winding to Phase C. Use DIP Switch 8 for proper single phase motor selection.
IMPORTANT:
Three Phase Motor
Terminal 1 (Yellow): YELLOW wire
Terminal 2 (Red): RED wire
Terminal 3 (Black): BLACK wire
10
SOLAR DRIVE WIRING INSTRUCTIONS
*
Single
Phase
3-Wire
Motor
Figure 8: Wiring Inside the Pentair Pentek Solar Drive
Solar PV 2
Three
Solar PV 1
Phase
Motor
Single Phase 3-wire Motor
Terminal 1 (Yellow): YELLOW wire – common motor lead
Terminal Aux (Grey): RED Aux wire – start motor lead
Terminal 3 (Black): BLACK wire – main motor lead
Terminal 2
(Red)
Terminal 3
System
Ground
P1062 (06/06/19)
(Black)
Red
Black
Red
Black

Publicidad

Tabla de contenido
loading

Tabla de contenido