Descargar Imprimir esta página

Sanus accents A302 Manual De Instrucciones página 4

Túnel de cableado

Publicidad

Idiomas disponibles

Idiomas disponibles

2
4
Carefully lift tunnel assembly and
position it at the desired location
making sure it is level.
Press firmly for 10 seconds at each
clip location along the length of the
assembly to secure the clips
01
clip
to the wall.
02
01
02
3
01
and
02
01
Peel the tunnels
03
away from the clips
and
.
01
02
03
03

Publicidad

loading