Complete The Installation - Kohler K-T7019 Guia De Instalacion

Ocultar thumbs Ver también para K-T7019:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Spout
Aerator

5. Complete the Installation

Ensure that both handles are turned off (hot = clockwise, cold =
counterclockwise).
Remove the aerator.
Turn on the main water supply and check for leaks.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
Reinstall the aerator.
Kohler Co.
7
1011303-2-C

Publicidad

Tabla de contenido
loading

Tabla de contenido