The smoke evacuation takes place through a chim-
ney (No.4 Figure 2) with automatic connection of the
machine.
This chimney must then be connected to the general
workshop extraction or brought outside the workshop.
In this second case, the chimney connected to the
machine must cover at least a portion in the vertical
of 1 meter before being led outside.
STAINLESS STEEL
MANUFACTURING
AUTOMATIC INTERIOR
CLEANING ZONE FOR
2 GUNS AND
ACCESSORIES
AIR INLET TO THE
MACHINE IN BACKSIDE
7.1. INITIAL AUTOMATIC WASHING
At the end of painting and to get a longer duration of
the solvent in the machine is recommended to
eliminate the excess of paint and a small manual
prewash before entering spray guns in the machine.
Open the lid and place the spray gun and acces-
sories as indicated in the picture, using the plastic
clip of the opening trigger that comes on the machine
and placed in the air inlet of the pneumatic device
protection. Close the lid.
6. MACHINE EXTERNAL PARTS
7. INSTRUCTIONS FOR USE
- 15 -
For an easy installation, the chimney is generally an
aluminum tube, flexible and extensible.
The fumes of solvent dispersed in that way do not
need further treatment.
II 3 GD
VAPOURS
EXTRACTION SYSTEM
EASY AND SOFT
OPENING COVER WITH
SHOCK
CONTROL PANEL
- ON / OFF
- TIMER
- SOLVENT LEVER DIRTY/CLEAN
- PUSH FOR INJECTION MANUAL
CLEAN SOLVENT
INTERIOR
ACCESS GATE