3. Installation
3.3 Handling
Handling Instructions
Before moving the equipment to the installation site, plan the route according to the
following:
1
Make sure the passage, floor, elevator or slope on the handling route can bear the
weight of the equipment and handling device, with sufficient net space to avoid
collisions.
2
In the case of a slope on the handling route, its inclination must not be greater
than 15 degrees.
3
The bottom casters are only suitable for short distance movement. For long distance
movement, use a handling device (such as a forklift in Figure 3-2) to avoid damage
to the casters.
4
The casters are only suitable for flat surface movement. Avoid moving the unit on
uneven ground, which may damage the casters or possibly result in toppling the
unit.
5
When moving the unit, pay attention to its height and center of gravity. For optimal
safety when moving, at least two people should handle the unit.
Levelers
After the unit is in place, stabilize by rotating the four levelers clockwise with a wrench.
Make sure the unit does not slide or wobble.
WARNING:
The levelers are used only for leveling the unit and cannot be used
to compensate for a height difference of the floor.
3.4 Positioning
After moving the unit into place and parallel with the adjacent cabinet, you must
ensure the unit's stability. The following two methods can be used, depending on the
installation environment:
Cabinet fasteners
Each cooling unit is provided with four connecting fasteners (two at the front and two
at the rear). Remove the front and back doors before making the fastener connection.
Refer to the following procedures:
1
If the front door is locked, use the key to open it.
2
Remove the control panel's flat cable and ground wire
and remove it.
1
2
, raise the front door
11
(Figure 3-2 : Forklift handling)
(Figure 3-3: Leveling feet)
(Figure 3-4 : Open the front door)