TRIPLE INSTALL WITH 30" BF IN CENTER POSITION - 30" COLUMNS
NOTE: These instructions do not replace individual product installation instructions. Refer to
product installation instructions for full installation process.
Doors Open
Independently
1. Panel required between
units: 3/4" thick, & 1 1/2" thick
minimum, 3.5-6" deep.
2. Position of ZIF301 & ZIR301 can
be interchanged.
3. Heater kits required: ZUG30
installed on left side of ZIK30 &
ZKUN installed on left side of
ZIR/ZIF301.
4. Ensure panel weight does not
exceed maximum rating.
5. Center unit requires 90° hinge
pin.
6. Each unit needs its own anti tip
system installed per individual
installation instructions.
7. Electrical and water locations for
each product are per individual
install instructions.
8. Mounting template should be
adjusted by 7/8" from the handle
side of the door.
2
Heater Kit
30" FZR CLM
30" CONVERTIBLE
ZIF301NPNII
3/4"
29-13/16"
30-9/16" opening:
column + 3/4" panel
Total opening width: 91-7/8"
Door Panel Width:
30-7/16"
Heater Kit
ZUG30
ZIK30GNNII
ZIW303NPPII
ZIK303NPPII
ZIC303NPPII
30" ZIK opening
column + 1-1/2" panel
Door Panel Width:
29-3/4"
NOTE: For independent door
opening, door panel cannot
cover 1-1/2" spacer panel.
ZKUN
30" REFRIG CLM
ZIR301NPNII
1-1/2"
29-13/16"
31-5/16" opening:
Door Panel Width:
29-9/16"
31-1000576 Rev. 0