Descargar Imprimir esta página

Monogram ZIF301NPNII Instrucciones De Instalación página 3

Ocultar thumbs Ver también para ZIF301NPNII:

Publicidad

Idiomas disponibles

Idiomas disponibles

TRIPLE INSTALL WITH 30" BF IN CENTER POSITION - 24" COLUMNS
NOTE: These instructions do not replace individual product installation instructions. Refer to
product installation instructions for full installation process.
Minimum Install Width
1. Panel required between units: 3/4" thick, and 3 1/2-6" deep.
2. Position of ZIF241 & ZIR241 can be interchanged.
3. Heater kits required: ZUG30 installed on left side of ZIK30, and ZKUN installed on left side of ZIR/ZIF241 unit on
the right.
4. Configurations with units installed hinge to handle may result in interference while opening doors. To
enable all three doors to open independently, additional clearance between the hinge to handle units is
required. See next page for details.
5. When installing custom handles, ensure handle position allows full door opening of adjacent units.
Example: Minimalist handle should be mounted with centerline a minimum of 1-3/4" from edge of door panel.
Statement handle should be mounted with centerline a minimum of 2" from edge of door panel.
6. Center unit requires 90° hinge pin.
7. Each unit needs its own anti tip system installed per individual installation instructions.
8. Electrical and water locations for each product are per individual install instructions.
9. Mounting template should be adjusted by 7/8" from the handle side of the door.
31-1000576 Rev. 0
Heater Kit
ZUG30
24" FZR CLM
30" CONVERTIBLE
ZIF241NPNII
3/4"
23-13/16"
24-9/16" opening:
column + 3/4" panel
Total opening width: 79-1/8"
Door Panel Width:
24-7/16"
Heater Kit
ZKUN
24" REFRIG CLM
ZIK30GNNII
ZIR241NPNII
ZIW303NPPII
ZIK303NPPII
ZIC303NPPII
3/4"
24-9/16" opening:
30" ZIK opening
column + 3/4" panel
Door Panel Width:
Door Panel Width:
29-3/4"
23-13/16"
24-7/16"
3

Publicidad

loading