Kohler K–2035 Guia De Instalacion página 3

Ocultar thumbs Ver también para K–2035:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Use lag bolts (not provided) to install the hanger and angle brackets
to the wall according to the roughing-in information. Make sure the
hanger is level, and is secured to the backing material behind the
finished wall.
Carefully lift the lavatory into place on the hanger, and level. You
may need to raise or lower the hanger so the lavatory contacts the
wall evenly.
NOTE: The lavatory must be supported by the hanger.
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall.
Carefully position the shroud under the lavatory, and mark the
finished wall at the upper anchoring hole locations.
Kohler Co.
3
1015627-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido