Ce Marking; Set-Up 4; Checking The Scope Of Delivery; Selecting The Lines - Saunier Duval RED-5 Instrucciones De Instalación

Ocultar thumbs Ver también para RED-5:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 11

3.5 CE marking

The CE marking shows that the products
comply with the basic requirements of the
applicable directives as stated on the de-
claration of conformity.
The declaration of conformity can be
viewed at the manufacturer's site.
4 Set-up

4.1 Checking the scope of delivery

Check that the scope of delivery is com-
plete.
Quant-
Component
ity
1
RED‑5
1
Installation accessories (bolts
and rawl plugs)
1
Documentation

4.2 Selecting the lines

Use standard commercial lines for the
wiring.
Do not use flexible lines for mains
voltage supply lines.
Use insulation cables for mains voltage
supply lines (e.g. NYM 3 x 1.5).
Line cross-section
Supply line for
mains voltage
(pump or mixer
mains cable)
eBUS line (extra-
low voltage)
Sensor line (extra
low voltage)
Line length
Sensor lines
Bus lines
0020257175_03 Installation instructions
≥ 1.5 mm²
≥ 0.75 mm²
≥ 0.75 mm²
≤ 50 m
≤ 125 m

4.3 Removing the front casing

A
Remove the front casing in accordance
with the illustration.

4.4 Installing the wall base

B
B
Install the wall base using the appro-
priate fastening material in accordance
with the illustration.

Set-up 4

C
B
A
33

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0020257510

Tabla de contenido