Decommissioning 6; Decommissioning The Heating Installation - Saunier Duval RED-5 Instrucciones De Instalación

Ocultar thumbs Ver también para RED-5:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 11
4. Strip the outer sheathing of the line,
without damaging the sheathing on the
connecting wires.
Connecting the line to the upper
terminal block
≤25 mm
A
B
5. Push the line that is to be connected
between the wall and wall base to the
upper terminal block.
6. Connect the required inputs and out-
puts in accordance with the illustration.
7. Connect the eBUS line to the terminal
block on the PCB. In doing so, ensure
that you comply with the polarity in the
system.
0020257175_03 Installation instructions
Connecting the line to the lower
terminal block
D
C
C
D
B
8. Connect all of the required lines in ac-
cordance with the illustration.
9. Install the front casing. (→ Page 34)
6 Decommissioning
6.1 Decommissioning the heating
installation
Decommission all system components
of the heating installation, as described
in the installation instructions for the
individual system components.
6.1.1 Removing the product from the
wall
1. Remove the front casing. (→ Page 33)
2. Disconnect the lines from the product's
terminal block.
3. Unscrew the wall base from the wall.

Decommissioning 6

E
≤25 mm
A
35

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0020257510

Tabla de contenido