Descargar Imprimir esta página

Federal Signal Streamline LP3 Serie Instrucciones De Instalación Y Servicio página 3

Ocultar thumbs Ver también para Streamline LP3 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

a.
on conduit hub for final tightening.
b.
2. Panel Mounting (LP3ML).
a.
b.
Tighten supplied locknut to secure the light.
c.
3. Surface Mounting (LP3TL).
a.
hole. Drill or punch out holes as necessary.
b.
Secure to mounting surface using the appropriate user-supplied No. 10 (5 mm) screws.
c.
C. Electrical Connections.
The lights come assembled from the factory with two or three color-coded leads for
making field connections.
To avoid electrical shock hazards, do not connect to supply circuit when power is
applied.
For AC units, connect the phase side of the line to the black wire, the neutral side of the
line to the white wire, and the ground to the green/yellow wire.
For DC units, connect the positive (+) source to the red wire and the negative (-) source
to the black wire.
II.
MAINTENANCE.
Maintenance personnel must follow all safety instructions and precautions listed at
the beginning of this manual prior to performing any maintenance on this product. Lamp
replacement is the only routine maintenance procedure required for this unit.
To avoid electrical shock hazards, do not replace lamp when power is applied.
Risk of fire, relamp only with factory provided replacement lamps.
Attach light to pipe by turning clockwise. Use a tool against wrench flats
Refer to section C for information on making electrical connections.
Drill or punch 7/8" (22.2 mm) diameter hole in mounting surface.
Locate gasket on mounting surface and set light on top of gasket.
Refer to section C for information on making electrical connections.
Using gasket as a template, mark two mounting holes and center wiring
Locate gasket on mounting surface and set light on top of gasket.
Refer to section C for information on making electrical connections.
-2-

Publicidad

loading