A) Composition; B) Technical Information; C) Installation - Roca ATAI 5A2734 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
TECHNICAL INFORMATION:
Composition (fig. A)
1. Handle plate
2. Screw
3. Thermostatic handle
4. O-ring
5. Spring
6. Button
7. Screw
8. Temperature lock
9. Thermostatic cartridge
ring nut
10. Thermostatic cartridge
11. Screw
12. Body
13. Block
14. Diverter cartridge
15. Diverter cartridge ring nut
16. Diverter handle
17. O-ring
18. Screw
Supply
Hot water temperature
Working pressure
We advise you to use a pressure reducer if water pressure exceeds 5 BAR.
With instantaneous gas heaters, minimum working pressure is 1 BAR.
INSTALLATION:
Instructions for correct installation.
Carefully clean the threads on the feed pipe.
Fig. C
Insert lower curve -32- into joints -33-, insert screws -31- tighten.
Fig. D
Place carefully the check valve seats -47- and the eccentrics -49-. Place Teflon or
other appropriate sealing material on eccentric -49- to guarantee the seal between
the wall attachments and the eccentric. Insert the group -47-+-49- into the wall. Screw
eccentrics -49- to the same depth in their wall seats. Place the two eccentrics
19. Case
20. Grub screw
21. O-ring
22. Fitting
23. Gasket
24. Shower handle tube
25. Shower handle body
26. Shower handle membrane
27. Shower handle diffuser
28. Gasket
29. Screw
30. Shower support
31. Screw
32. Lower curve
33. Joint
34. Main column
35. Upper curve
36. Top shower head tube
37. Top shower head body
Recommended
55°-65°
1-3 BAR
9
38. Top shower head membrane
39. Top shower head diffuser
40. O-ring
41. Fitting
42. Elbow
43. Screw
44. Washer
45. Anchor
46. Check valve
47. Check valve seat
48. Filter gasket
49. Eccentric
50. O-ring
51. Horizontal template
52. Vertical template
53. Screw
54. Anchor
55. O-ring protection
56. O-ring protection
Maximum
80°
5 BAR
Minimum
15°
0.5 BAR

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido