Kohler K–2326 Guia De Instalacion página 3

Ocultar thumbs Ver también para K–2326:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

17" (43.2cm)
2-7/8"
4
(7.3cm)
(10.2cm)
9-3/4"
(24.8cm)
27"
(68.6cm)
C
L OF BACKING
6-1/4" (15.9cm)
14-1/4"
(36.2cm)
3/8"
HOT
4"
(10.2cm)
3/8"
COLD
1-1/4"
OUTLET
1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles
will not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a
secure material for the anchoring devices.
Mark the centerline on the floor.
Apply two self-adhesive gaskets (provided) to each of the three
ribs on the bottom of the basin.
Place the pedestal on the centerline in the approximate location.
Carefully lift the lavatory into place on the pedestal, and slowly
move the pedestal as required to ensure proper fit in the desired
location.
NOTE: The lavatory must be supported by the pedestal.
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall.
Kohler Co.
K-2326-8
3-1/4"
10-1/2"
(8.3cm)
(26.7cm)
1/2" D. (1.3cm)
MOUNTING HOLE
IN PEDESTAL
2-1/8"
7-5/8"
10"
(5.4cm)
(19.4cm)
(25.4cm)
36"
1/2" D. (1.3cm)
(91.4cm)
ANCHOR
HOLES
FINISHED
FLOOR
3
K-2326-1
2-7/8"
(7.3cm)
K-2326-4
4 (10.2cm)
2-7/8"
(7.3cm)
FINISHED WALL
20-1/8"
(51.1cm)
7"
(17.8cm)
4-3/4"
(12.1cm)
1016769-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido