6. Installing of the hydraulic hose/hoses
a. The hydraulic hose/hoses are already installed.
Check and if necessary tight all the hydraulic fitting connections
7. Hydraulic oil
a. Fill hydraulic oil until the oil level reaches the mark on the dipstick.
b. For venting of the hydraulic circuit leave the Tank cap for the first 10 lifting movements
opened.
8. Electric connection
Hereby have to be observed the general and local regulation. Therefore, this step can
only be done only by trained/skilled persons/experts.
Pay attention to the necessary supply (see specifications).
9. Control before the first lifting
a. All the screws, nuts etc. are tightened.
b. Check all the hydraulic connections and cylinders for leakage if necessary retighten.
c. Functioning of all push buttons. Take care that when you press the push button down all the
locking catches are unlocked.
d. Correct direction of the motor rotation.
e. Lower the lift completely and keep pressed the push button „DOWN „approximately 15
seconds so that the hydraulic system will be completely de-aired.
10. After the installation fill out the attached inspection report.
This information is required in a possible case of a potential claim.
2.10 Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-11
Manufacturer ATH-Heinl GmbH & CO.KG
- 23 -