Glaziar Predator SO2000UV Manual De Uso página 31

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Insert (4) 2" Threaded bolts into screw holes at
cornersof mounting plate. Attach (4) toggle
adhesive gasket bolt anchors to
7- Insert (4) toggle bolts into 3/8" holes in duct.
Be sure toggle anchors open after inserting
9-Insert unit into opening. Be sure
the air will pass though the PCO
GLAZIAR cell honeycomb matrix.
11-Plug unit into working power receptacle.
Hard wiringunit into HVAC system should
be done by a licensed HVAC installer or
31
ends of threaded bolts.
electrical contractor only.
Stud
6 - Remove backing from mounting
plate adhesive gasket
8- Center large opening in mounting plate
over 3.5" opening in duct and press
plate to duct. The adhesive gasket will
hold the mounting plate into place.
Tighten toggle bolts -
DO NOT OVERTIGHTEN.
10-Secure the unit to the mounting
plate with (4) #8-32 nuts..
www.glaziar.com / info@glaziar.com

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Predator so5000uv

Tabla de contenido