Operation - Glacier bay FS6AC071CP Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para FS6AC071CP:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
7
Checking the operation of the
pop up
Operate the lift rod (P) up and down to verify
that the stopper (M) opens and closes correctly.

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator to flush the water lines. Do not lose the gasket in
the aerator.
Ensuring the handles are in the off position, turn
on the water supply and check for leaks. If you
discover any leaks, check your connections to
ensure they are installed properly.
Remove the aerator (B) and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This flushes
away any debris that could cause damage to
internal parts.
Turn off the water and reinstall the aerator (B) and
housing (if applicable).
P
M
8
Making the water supply
connections
CAUTION: Ensure the supply lines do not kink, twist or
bend into a "V" or "L" shape during installation. Do not use
if there are visible signs of damage.
Use two adjustable wrenches to connect and
tighten the supply lines to the supply valves.
Connect the red supply line to the hot water
supply valve.
Connect the blue supply line to the cold water
supply valve.
RED LINE
1
HOT
COLD
A
B
7
Please contact 1-855-HD-GLACIER for
BLUE LINE
1
2
1
HOMEDEPOT.COM/GLACIERBAY
further assistance.

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

279-499

Tabla de contenido