Descargar Imprimir esta página

nVent RAYCHEM E-100-L Serie Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

3
2 1/4 in
(57 mm)
• Measure exactly 2 1/4 in (57 mm).
• Lightly score outer jacket around and
down as shown.
• Bend heating cable to break jacket at
score; peel off jacket.
• Remove all exposed braid.
4
• Determine heating cable type and continue as shown.
XTV, KTV
BTV, QTVR
VPL
5A
• Measure exactly
1 3/8 in (35 mm).
• Lightly score inner
jacket around and
down as shown.
• Peel off jacket.
• Cut and remove all
fiber strands.
Go to Step 5A
• Score and remove
Go to Step 5B
center spacer.
• Remove any
Go to Step 5C
remaining fiber
material from bus
wires.
XTV, KTV
Do not cut bus wires
1 3/8 in
(35 mm)
Go to Step 6
nVent.com | 3

Publicidad

loading

Este manual también es adecuado para:

E-100-l1E-100-l2