Connecting The Electrode; Connecting The Temperature Probe; Switching The Meter On And Off - Metria M21 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5
Overview
Connection

Connecting the electrode

1.1
Take out the pH electrode from the packaging. Follow the steps below to place the electrode into left or right side of the
electrode arm.
1.2
Insert the BNC connector into the connector socket labeled pH/ISE. Rotate and push the connector clockwise until it locks.
After the
connection is completed, DO NOT pull on the cable. Always make sure that the connector is clean and dry.
1. Insert the electrode

Connecting the temperature probe

2.1
Place the temperature probe into the circular hole located at the center of the electrode arm.
2.2
Insert the jack plug to the connector socket labeled ATC. Ensure the connector is fully seated.
1. Insert the probe

Switching the Meter On and Off

1.
Insert the connector of power adapter to the power socket.
2.
Press and release the Meas key to switch on the meter. Press and hold the Meas key for 3 seconds to switch off the meter.
2. Hook up the cable
2. Hook up the cable

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido