Complete The Installation - Kohler K-11344 Guia De Instalacion

Bañera autosoportada
Ocultar thumbs Ver también para K-11344:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Complete the Installation

Secure the drain tailpiece to the P-trap.
Install the Trim
Insert the plug into the drain outlet. Adjust the height of the plug, if desired.
NOTE: To ensure the setscrew does not inadvertently fall down the drain outlet, push down on the plug
to close the drain hole.
Secure the handle to the overflow outlet with the setscrew.
Turn the handle counterclockwise and clockwise to ensure proper operation of the plug.
Complete the Freestanding Bath Installation
Install the bath faucet to complete the installation. Refer to the faucet manufacturer's installation
guide.
Run water into the bath, then check the drain connections for leakage.
1055344-2-A
Overflow Outlet
Handle
Setscrew
Plug
Drain
Outlet
8
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido