4.4.4.2
With 4 kW electrical booster
N
L
L
L
1
2
3
4.4.4.3
With 6 kW electrical booster
N
L
L
L
N
1 2
1
2
3
4.4.4.4
With multi-stage booster
2Kw
4Kw
Key
1
Electrical booster module
2
Towards command relay
3
Electrical shunt
4.5
Cableway and passage
i
Notes
The cables must pass through the openings
provided for this purpose.
1
Key
1
Passage for power cables and relay command cables
2
Temperature probe cable passage
Caution!
b
Comply with electrical cable routing !
Keep a distance of 10mm between
•
connecting cables and metallic elements
that are a heat source.
0020152779_02 - 04/13 - Vaillant
1
N
1 2
2
1
3
2
1
1 2
N
L
L
L
N
1
2
3
2
2
2
1
Key
1
Power cable (*)
2
Relay command cable (*)
3
Temperature probe cable (Sensor included no mounting)
(*)
Not included
Notes
i
The temperature probe must be assembled
using thermal paste for good heat transfer.
5
Start up
∙ For fi lling, refer to the installation instructions of the heat
pump.
∙ Check the electrical and water installation.
∙ Check all connections for leaks..
∙ Purge your heating system.
∙ Replace the power.
5.1
Purging the appliance
1
Key
1
Air vent
START UP
3
EN
24