dBTechnologies VIO S118 Manual Del Usuario página 56

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

VIO-S118
56
Bring the additional 4 modules with a second DT-VIOL210 dolly
under the first 4, currently suspended.
Apply brakes to the dolly and adjust the angles as described in
the previous step.
Remove the cover and the tubes on the front of DT-VIOL210.
Properly lower the 4 suspended modules and hook them as
described in the
MECHANICS
for both front and rear. Pay careful attention to this step when
moving the upper suspended block.
Complete audio, RDNet and power supply re-link connections
as described in the previous paragraphs. To find the maximum
number of power connections in a re-linked system, see the
TECHNICAL SPECIFICATIONS
!
WARNING
The maximum load must always be checked in advance using
dBTechnologies Composer.
DRK-210 was designed for the suspension of up to 750 kg with a
single hooking point.
The VIO L210 suspension components allow to connect up to
10 modules (300 kg max) without limiting the angulation of the
line array. Any other configuration or information regarding
the system's data, such as the maximum capacity and hooking
points, must be verified prior to the installation using the
software from rev. 6.3.0 onwards (see the relevant paragraph in
this user manual). It is available for free on the website www.
dbtechnologies.com under the DOWNLOADS section.
Moreover, it is mandatory to use FSA-VIOL210 flown between
VIO S118 and VIOL210. For further information refer to the
instructions supplied with the accessory.
paragraph of ViO-L210 manual
section.
Cod. 420120259 REV. 1.0
English

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido