Installation Instructions - allen+roth BV-6333-36 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Installation Time: 20-30 minutes (24 hours for adhesive to dry).
Tools Required for Installation (not included): Silicone compound, Utility knife.

INSTALLATION INSTRUCTIONS

Step 1: Vanity Drawer Removal
1a. Open the preassembled drawer as far as possible.
1b.
Simultaneously press the plastic cards on the bottom
of drawer left side and right side inward.
1c. Once both plastic cards are held in the indicated position,
pull the drawer straight out.
1
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

2694559

Tabla de contenido