Descargar Imprimir esta página

MEI CASHFLOW 7000 Serie Manual De Instrucciones página 2

Ocultar thumbs Ver también para CASHFLOW 7000 Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Preparing for Installation
Turn OFF all power to the vending machine.
To ensure that the changegiver performance is not
affected, visually check the vending machine is
upright, both from the front and side.
Before mounting the changegiver to the vending
machine, check the operating voltage of the vending
machine matches that stated on the changegiver
label.
Installing the changegiver to the machine
The changegiver is mounted onto the vending machine by hanging it onto three
studs located on the vending machine. To do this you will need to open the
discriminator assembly and line up the mounting keyholes of the coin manager
with the vending machine studs.
Press the yellow button at the top of the coin manager and gently lift and pull
the discriminator assembly forward. Once open, the mounting keyholes will be
made visible.
To securely fix the changegiver in place, partly unscrew the three machine
studs.
Line up the three mounting keyholes of the changegiver with the studs and
hang it in place ensuring that the changegiver is sitting flat against the
machine back plate.
INSTALLATION
Page 2 of 10
Label

Publicidad

loading

Productos relacionados para MEI CASHFLOW 7000 Serie

Este manual también es adecuado para:

793836001