RAIN S.p.A.
via Kennedy 38/40
20023 Cerro Maggiore
ITALY (MI)
4.2 OTHER LATCHING SOLENOIDS
1. Cut off the quick couplings and strip around 15 mm of insulation from the ends of
each cable.
2. Connect the black wires coming from each solenoid to the black cables coming
from the controller. Secure all cable couplings with waterproof connectors.
3. Connect the red wires coming from each solenoid to the corresponding station
wire (blue cable) coming from the controller. Station numbers are identifi ed by the
tag on the cable. Secure all cable couplings with waterproof connectors.
Cavo blu
Cavo blu