- Ceiling Installation
1. Install the heat recovery unit on a ceiling with a mass of
2
at least 200 kg/m
.
2. Mark the position for the fastening points on the
ceiling.
- Wall Installation
1. Install the heat recovery unit on a wall with a mass of
2
at least 200 kg/m
.
2. Mark the position for the fastening points on the wall.
3. Position the unit in suspension.
Take into consideration a minimum slope of 5 mm
towards the condensate drain.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
5 mm
3. Position the unit.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
English
67